
Learn About the Differences in Federal Land Designations
If you are a hunter, angler, camper, hiker, wildlife watcher, or live anywhere in rural Arizona, you are well acquainted with the treasure of Federal public lands in our State. It’s almost a certainty that one of your favorite places is located on these public lands. It is also very likely that you have been confused at some point by land designations (e.g., National Conservation Area, National Park, National Monuments, National Forest, National Recreation Areas, Wilderness, National Historic Site, and many more). Learn more about these differences and what they mean for outdoor recreation by clicking the LEARN MORE button. You will be redirected to a great article that Brad Powell, the former president of the Arizona Wildlife Federation, has written.
Four Forest Restoration (4FRI) Initiative
Four national forests – the Kaibab, Coconino, Apache-Sitgreaves and Tonto – are actively managed in a collaborative initiative to carry out landscape-scale restoration of the ponderosa pine forests in northern Arizona. Various types of restoration work including wildlife habitat improvement, grassland restoration, watershed maintenance, spring restoration, stream channel restoration, trail and road maintenance, road decommissioning as well as thinning and prescribed burning are part of this vast initiative. Arizona Trout Unlimited supports many of these efforts to create sustainable ecosystems hand in hand with sustainable industries.
Arizona Trout Unlimited Tracked Conservation Projects:
Upper East Verde River Watershed Restoration
21 simple instream habitat structures will be installed throughout the upper portions of East Verde over multiple years, similar to what TU did four years ago. Structures were installed in September 2026, with volunteer opportunities coming in May 2027 and Fall 2027.
- Current costs: $1,000 each year for logs, equipment, and miscellaneous expenses
- Funds secured: $0
- Funds needed: $1,000 each year
- LOP: $10,000
Deep Creek Culvert Replacement
An engineering assessment and design have been completed to improve/ replace eight culverts on Deep Creek, located on White Mountain Apache Tribal Lands. This project will enhance Apache trout fish passage and connect 10.1 miles of habitat.
- Current costs: $3,000,000
- Funds secured: $1,100,000
- Funds needed: $1,900,000 (pending application with BOR)
- LOP: $3M
Chase Creek headwaters restoration project
The stream habitat needs to be improved for a recovery population of Gila trout, and the invasive blackberry needs to be removed. NCD has assessed the project site and completed the engineering designs. Construction is planned to start in June of 2027.
- Current costs: $725,000 for construction implementation
- Funds secured: $240,000
- Funds needed: $485,000
- LOP: $815,000
Boggy Creek wet meadow restoration and exclosure
TU has contracted the engineering assessment for this project that will utilize low-tech process-based restoration (LTPBR) techniques to increase floodplain storage, restore stream function and natural flow regimes, address erosion processes, restore channel stability, increase surface water-groundwater exchange and floodplain connection, and make the landscape more resistant to impacts from wildfire and drought. This is a multi-year, multi-phase project. TU will utilize low-economic timber from surrounding hillslopes for all in-stream structures. Thinning upland forest to restore lowland wet meadows. Construction for the forest thinning and in-stream structures will start in Spring 2027.
- Current costs: $300,000 for construction implementation
- Funds secured: $150,000
- Funds needed: $150,000
- LOP: $350,000
Hayground Creek
We are constructing an exclosure on 104 acres of riparian habitat and 1.76 miles of Hayground Creek. After the exclosure is constructed, we will plant native vegetation along the riparian corridor and thin the encroaching ponderosa pine trees.
- Current costs: $400,000
- Funds secured: $0
- Funds needed: $400,000
- LOP: $400,000
Bear Wallow Wilderness Fish Barrier Removal
An ineffective rock gabion fish barrier has been in place for 50+ years. We are looking to remove or reroute the stream around the barrier before the structure receives historical protections. We have contracted the assessment and design and are working with the Forest Service to complete all the necessary paperwork to conduct this project in the wilderness and remove it with explosives. The MRAF and BA are complete, and the Forest Service has selected an alternative for TU to follow. A blasting plan is currently being drafted, with a target date of October 2027 to remove the barrier.
- Current costs: $50,000, needed for explosives, helicopter rental, dumpster rental, and miscellaneous expenses.
- Funds secured: $0
- Funds needed: $50,000
- LOP: $120,000
South Fork Little Colorado River
AZGFD has contracted the design for this Apache trout habitat restoration project. TU has contracted and completed an archaeological study. We are now waiting for the Forest Service to complete the CE NEPA process, then begin construction. Construction is scheduled for two work seasons, Fall 2027 and 2028. AZGFD is contributing $260,000 toward construction costs; TU is paying the remaining $140,000.
- Current costs: $140,000 for construction implementation
- Funds secured: $0
- Funds needed:$140,000
- LOP: $430,000
Centerfire Creek wet meadow restoration
TU has contracted the engineering assessment for this project that will utilize low-tech process-based restoration (LTPBR) techniques to increase floodplain storage, restore stream function and natural flow regimes, address erosion processes, restore channel stability, increase surface water-groundwater exchange and floodplain connection, and make the landscape more resistant to impacts from wildfire and drought. This is a multi-year, multi-phase project. TU will utilize low-economic timber from surrounding hillslopes for all in-stream structures. Thinning upland forest to restore lowland wet meadows. Construction could potentially start in Fall of 2028.
- Current costs: $500,000 for design and construction
- Funds secured: $0
- Funds needed: $500,000
- LOP: $530,000
Dude Creek Blackberry removal and riparian planting
Remove blackberry throughout the perennial stretch of Dude Creek. And conduct riparian plantings on the AZGFD project site and TU project site to stabilize banks.
- Current costs: $35,000
- Funds secured: $0
- Funds needed: $35,000
- LOP:$35,000
Glen Canyon Dam Adaptive Management Plan
The Upper Colorado Basin requires ongoing monitoring and protection of endangered species. Arizona Trout Unlimited is helping to utilize science to identify best practices to manage the land, foster relationships with tribal entities and create a balanced plan of stewardship to ensure a harmonious relationship between recreation and environmental concerns.
Thompson-Burro Meadow
Wet meadow restoration and floodplain reconnection that will benefit Apache trout and downstream users. This project is broken into three phases: phase 1: in-stream structures; phase 2: elk exclosure; phase 3: riparian planting. Phase 1 was completed in December 2025, and Phase 2 started in Jan 2026, with an estimated completion by March 2027. Phase 3 riparian planting is tentatively scheduled for June 2027 and will take three summers to fully complete.
- Current costs: $40,000, needed for Phase 3 riparian plants
- Funds secured: $10,000 (old Pueblo Chapter)
- Funds needed: $30,000
- LOP (life of project) cost: $1.8M
Home Creek wet meadow restoration
TU has contracted the engineering assessment for this project that will utilize low-tech process-based restoration (LTPBR) techniques to increase floodplain storage, restore stream function and natural flow regimes, address erosion processes, restore channel stability, increase surface water-groundwater exchange and floodplain connection, and make the landscape more resistant to impacts from wildfire and drought. This is a multi-year, multi-phase project. TU will utilize low-economic timber from surrounding hillslopes for all in-stream structures. Thinning upland forest to restore lowland wet meadows. Construction could potentially start in Spring of 2028.
- Current costs: $130,000 for design and construction
- Funds secured: $0
- Funds needed: $130,000
- LOP: $150,000
Canyon Creek
Last season’s runoff ripped out the original habitat structures. TU is under contract with an engineer to assess and design a restoration project from the headwaters down, reconnecting the stream to the floodplain so the energy of these high-flow events dissipates there.
- Current costs: $70,000 for assessment and design
- Funds secured: $25,000
- Funds needed: $45,000
- LOP: $1,000,000 includes construction implementation
C. Craigin Watershed (formerly Blue Ridge Reservoir) Protection
Reducing the risk of wildfire and reestablish a fire adapted, resilient, diverse and sustainable forest ecosystem surrounding the City of Payson’s primary water supply. This project is a combined effort between Salt River Project, the Town of Payson, Bureau of Reclamation, Coconino National Forest, National Forest Foundation and Arizona Trout Unlimited to provide actionable mitigation of the risks to the watershed and the surrounding resources.
Native Trout Catch/Release and Recovery Stream Signage
In conjunction with Arizona Game and Fish Department and the US Forest Service, AZTU is working to place informational signage informing anglers of efforts to protect our native trout species.
Position On Native And Wild Non-Native Salmonid Management
Arizona is fortunate to have historic populations of native trout species (Apache, Gila) and many well-established populations of several wild (naturally reproducing) non-native salmonids (Rainbow, Brown, Brook, and Grayling). The conservation of all Arizona’s native trout and wild non-native salmonids is a priority of the Arizona Council of Trout Unlimited (AZTU) and we believe that both native and wild non-native fishes of all salmonid species are important components of the state’s aquatic communities. Both native and wild non-native salmonids have important cultural, recreational, scientific, economic and legacy values.
The Conservation Committee
The Conservation Committee is a project oriented committee and meets as often as necessary to ensure meetings have a purpose and are a valuable use of our members’ time. To be alerted to upcoming Conservation Committee meetings or for more information, please contact ConservationChair@az-tu.org.